BNP Paribas Bank

The tall 9m atrium at the Marylebone HQ of BNPP presented a challenge to the designers on this project. AROS Architects had the vision of lighting the space purely from artificial skylight but also needed to provide a high level of illumination at desk level.

There was also an issue of maintenance that had to be addressed. The NOREA LED system fitted the bill perfectly. With its trim-less design and discreetly integrated ceiling system, an 8×8 grid system was created to give an homogeneous square of light.

With the high performance LED system employed, a level of over 500 lux was achieved at floor level to give impact to the reception space. The LED system will also have a 15 year service life.

Recent Spectral Projects

The Rowe Central House

HALO Bristol

The Bindery

Chivas Brothers Bottling Facility

John Robertson Architects

Gallery

Products Used

No results found.

Spectral Projects

Wolfson College Buttery

Wolfson College Buttery

Oxford UniversityWolfson College was founded in 1966 and is the largest and most international of the Oxford ...
Woodcote Grove

Woodcote Grove

Atkins established their head office base in Epsom nearly 60 years ago and in that time have grown into the major ...
St Matthews Church, Cambridge

St Matthews Church, Cambridge

Built in 1866 and designed by Richard Rowe, one-time understudy to George Gilbert Scott in the 1850s in his work at Ely Cathedral.
Guildford Borough Council

Guildford Borough Council

Guildford Borough Council’s 30 year old office is a facility for public, staff councillors and visitors and its ...
1

Pin It on Pinterest

Share This