The tall 9m atrium at the Marylebone HQ of BNPP presented a challenge to the designers on this project. AROS Architects had the vision of lighting the space purely from artificial skylight but also needed to provide a high level of illumination at desk level.
There was also an issue of maintenance that had to be addressed. The NOREA LED system fitted the bill perfectly. With its trim-less design and discreetly integrated ceiling system, an 8×8 grid system was created to give an homogeneous square of light.
With the high performance LED system employed, a level of over 500 lux was achieved at floor level to give impact to the reception space. The LED system will also have a 15 year service life.
Recent Spectral Projects
The Rowe Central House
HALO Bristol
The Bindery
Chivas Brothers Bottling Facility
John Robertson Architects
Products Used
No results found.
Spectral Projects

Taboola – 33 Aldgate
Since 2007 Taboola have been building the world’s largest and most advanced ‘discovery platform’ — or “search ...

The Battle of Britain Memorial. The Wing
Local consulting engineer, Crofton Design, was called upon to create a fitting experience to continue the legacy of

Bristol University, Geography Building Library
The building is a traditional Victorian construction with a nice high ceiling. The tall deep windows were also a ...

Aberdeen Art Gallery
Aberdeen Art Gallery has recently reopened to the public after a four-year refurbishment which cost £34.6m. It has ...