The tall 9m atrium at the Marylebone HQ of BNPP presented a challenge to the designers on this project. AROS Architects had the vision of lighting the space purely from artificial skylight but also needed to provide a high level of illumination at desk level.
There was also an issue of maintenance that had to be addressed. The NOREA LED system fitted the bill perfectly. With its trim-less design and discreetly integrated ceiling system, an 8×8 grid system was created to give an homogeneous square of light.
With the high performance LED system employed, a level of over 500 lux was achieved at floor level to give impact to the reception space. The LED system will also have a 15 year service life.
Recent Spectral Projects
The Rowe Central House
HALO Bristol
The Bindery
Chivas Brothers Bottling Facility
John Robertson Architects
Products Used
No results found.
Spectral Projects

Guildford Borough Council
Guildford Borough Council’s 30 year old office is a facility for public, staff councillors and visitors and its ...

AHMM Architects
Leading London architects firm, AHMM, wanted to create a feature look for their newly refurbished reception ...

BDI Oxford
The Big Data Institute (BDI) is a 7,500 m2 medical research building, dedicated to analytical research of the ...

The largest pendant light fitting in the world
Sheppard Robson ID:SR approached Spectral Lighting with a challenging vision. To create two huge rings to light the