The tall 9m atrium at the Marylebone HQ of BNPP presented a challenge to the designers on this project. AROS Architects had the vision of lighting the space purely from artificial skylight but also needed to provide a high level of illumination at desk level.
There was also an issue of maintenance that had to be addressed. The NOREA LED system fitted the bill perfectly. With its trim-less design and discreetly integrated ceiling system, an 8×8 grid system was created to give an homogeneous square of light.
With the high performance LED system employed, a level of over 500 lux was achieved at floor level to give impact to the reception space. The LED system will also have a 15 year service life.
Recent Spectral Projects
The Rowe Central House
HALO Bristol
The Bindery
Chivas Brothers Bottling Facility
John Robertson Architects
Products Used
No results found.
Spectral Projects

Vajrasana Retreat
The Vajrasana Retreat Centre in Suffolk is a buddhist retreat, located in the middle of Suffolk’s countryside, ...

Victoria Rooms, University of Bristol
The Victoria Rooms campus at the University of Bristol has recently installed a number of bespoke chandeliers, ...

Porsche Centre, Oslo
Porsche and Spectral. The two Stuttgart based companies have worked in collaboration again, this time for Porsche ...

Woodcote Grove
Atkins established their head office base in Epsom nearly 60 years ago and in that time have grown into the major ...