Lord’s Cricket Ground

Burrell Foley Fischer were the architects to the Contractor, Knight Harwood, for the refurbishment of the Grandstand at Lords, based on a design intent by Populous Architects. The project involved the refurbishment of their main bar and catering facilities, including the ECB Box and the Father Time Bar and was again completed in time for the first Test Match in the spring of 2015.

 Jon Estell: “much work was done on the lighting levels and direction of light for the central spine ‘corridor’ that links not only the boxes and restaurant areas but all the essential circulation areas, toilets, entrances, stairs etc. It formed a vital part of the overall design. To witness the transformation from a dark and miserable circulation thoroughfare to a bright and celebratory journey with memorabilia and famous images on the walls, was a pleasure. The restaurant and bar were challenging due the extremes of light levels from a façade of daylight on one side of the building to dark low ceilings on the other. Modelling the spaces with real lighting photometric data was essential and contributed to Spectral being able to present the intention

Recent Spectral Projects

The Rowe Central House

HALO Bristol

The Bindery

Chivas Brothers Bottling Facility

John Robertson Architects

Products Used

H80-Profil

H80-Profil

The H80 profile consists of two mirrored T-profile aluminium extrusions, which are joined by special connectors to form an extremely stable H construct.
VLG-FP

VLG-FP

Low profile LED gear trays with a diverse range of light distributions from special linear lenses
Blade

Blade

Blade combines vertical acoustic elements and luminaires for optimum user comfort in terms of lighting technology and acoustics.
Aoca

Aoca

The Aoca pendant luminaire perfectly integrates into all kinds of high ceiling spaces with a classic cylindrical look.

Spectral Projects

The largest pendant light fitting in the world

The largest pendant light fitting in the world

Sheppard Robson ID:SR approached Spectral Lighting with a challenging vision. To create two huge rings to light the
BNP Paribas Bank

BNP Paribas Bank

The tall 9m atrium at the Marylebone HQ of BNPP presented a challenge to the designers on this project. AROS ...
Am Theatre Car Park

Am Theatre Car Park

AM Theater Car Park, Frankfurt am MainAM Theatre Car Park, Frankfurt am MainThe ‘Am Theater’ underground car park ...
Ludwig Erhard Zentrum

Ludwig Erhard Zentrum

The Ludwig Erhard Center in Fürth is intended to serve as a museum of memory of the Federal Chancellor Ludwig ...
1

Pin It on Pinterest

Share This