Cumnor House School, Haywards Heath

Cumnor house school is an independant school near Haywards Heath near the South Downs National Park in England. The project involved two new buildings. The nursery/pre-school block was a single storey building made into one large open plan space. Here they used a suspended ceiling grid where we used ARKTIK-LED PS luminaires to provide an efficient yet broad spread of light. EDLR’s were also provided for circulation spaces. The room was controlled via a DALI scene setting plate to enable 4 different moods which ranged from rest mode to high energy mode. Light sensors also ensured energy was not wasted.

The second building was a modern 2 storey building for the main prep school which featured interesting ceiling details. This was the new science block. Here the main teaching spaces were lit with suspended louvred F-LINE LED luminaires with additional indirect light. In some bulkhead areas, EBRME-R luminaires with matching louvres were used. EDLR’s were also used over circulation and core areas as well as WL-R luminaires which were suspended. All luminaires were supplied as DALI and controlled by scene set controllers in each classroom to enable special teaching modes such as projector mode.

Lighting Design:  PJR Design of Brighton
Architects: George Baxter Associates of Haywards Heath.

Recent Spectral Projects

The Rowe Central House

HALO Bristol

The Bindery

Chivas Brothers Bottling Facility

John Robertson Architects

Products Used

ARKTIK

ARKTIK

A premium backlit LED modular recessed luminaire with a cool polar white diffuser
EDLR

EDLR

Range of LED downlights from 150mm to 400mm diameter with outputs from 1100 to 6000 lumens
F-Line

F-Line

Shallow suspended direct indirect luminaire using RIDI Group's easily replaceable R-Tube LED light sources
ALBA

ALBA

Range of LED downlights from 150mm to 400mm diameter with outputs from 1100 to 6000 lumens

RIDI Projects

Pippbrook House (Mole Valley District Council)

Pippbrook House (Mole Valley District Council)

The refurbishment of the Pippbrook house offices for Mole Valley District Council took place over the period of a ...
Leeds Station

Leeds Station

Completed in early 2020, Leeds central station features tuneable white Venice with a Control 3 human centric lighting system to match the local natural light.
Tafelladen, Tübingen

Tafelladen, Tübingen

The Tübinger Tafel (Tübingen Food Bank) has made it its mission to collect surplus food and food waste, and to give
Guildford Borough Council

Guildford Borough Council

Guildford Borough Council’s 30 year old office is a facility for public, staff councillors and visitors and its ...
1

Pin It on Pinterest

Share This