Bristol University – Humanities Hub

The University of Bristol’s School of Humanities is located in a series of listed Victorian villas in the heart of the Universities quarters in Clifton. A complex refurbishment was planned and designed by ADP Architects where a new state-of-the-art Humanities Hub Building was added on. The new teaching hub comprises three linked pavilions. These provide a range of teaching spaces, including large, flexible teaching rooms, a cinema room, a 240-person lecture theatre and academic offices. The pavilions and the villas are joined via single-storey links, which provide circulation and exhibition space, and a flexible social learning zone at the heart of the scheme. RIDI Group together with CMB Engineering provided an intricate solution of various products, mainly from RIDI and Spectral brands but also from some of our alliance partnership brands.

The main lighting scheme was a combination of RIDI’s VENICE linear products and Spectral’s acoustic Blade system. Venice was used in both recessed and suspended modes throughout the varying site architecture. As a general theme, suspended versions were slotted into gaps between suspended acoustic rafts. These varied in lengths to suit the spaces. Whereas recessed versions were used in between the timber slatted ceiling sections and areas that contained plasterboard margins. Where the ceilings became higher and where rooflights were used, the Spectral Blade was used as a contrast, providing vertical acoustic baffling but also allowing natural light through.

Spectral provided additional lighting with STORA-LK feature rings which had internally filled acoustic sections. Stylish trim-less Norea wall lights, also by Spectral, were also used on natural stone surfaces as a performance wall light.

Elsewhere other products used to complete the project were RIDI EDLR downlighters for toilets and core areas as well as an assortment of VLDF compact linear fixtures. KARO spotlights were used on track in a gallery zone and RIDI’s tried and tested PFZO corrosion resistant luminaire was used in functional areas. External low level Polos bollards and inground lighting were supplied from Landa.

Finally, RIDI Group delivered the 24V central battery emergency system which linked all the emergency monitoring to the University’s main system.

Recent Spectral Projects

The Rowe Central House

HALO Bristol

The Bindery

Chivas Brothers Bottling Facility

John Robertson Architects

Products Used

ALBA
Stora-LK
VENICE
ALBA Surface
KARO
Blade
VLDF

Products Used

KARO

KARO

3x3 or 4x4 multipoint spotlight for track mounting with three beam angles
VENICE

VENICE

Continuous LED light channel in extruded aluminium for surface, pendant or recessed mounting
ALBA Surface

ALBA Surface

Range of LED downlights from 150mm to 400mm diameter with outputs from 1100 to 6000 lumens
ALBA

ALBA

Range of LED downlights from 150mm to 400mm diameter with outputs from 1100 to 6000 lumens

Spectral Projects

Sky, Brick Lane

Sky, Brick Lane

Spectral Lighting has provided an entire office fit-out using IRIS LED pendant luminaires to the Sky UK office ...
Christ Church Downend

Christ Church Downend

Bristol, UKChrist Church Downend was constructed in 1836 and is a Grade II listed church. As part of the ...
St Matthews Church, Cambridge

St Matthews Church, Cambridge

Built in 1866 and designed by Richard Rowe, one-time understudy to George Gilbert Scott in the 1850s in his work at Ely Cathedral.
BNP Paribas Bank

BNP Paribas Bank

The tall 9m atrium at the Marylebone HQ of BNPP presented a challenge to the designers on this project. AROS ...