DIXIE DEAN HOSPITALITY SUITE FC EVERTON

Having supplied the iconic centre piece lighting structure for the main reception at Everton FC’s corporate HQ in the Liver Building, Spectral have again provided another design lead scheme. This time we have worked with Everton’s Goodison Park Stadium to provide all of the pendant feature ring luminaires for the recently opened Dixie Dean hospitality Suite. A mixture of 950mm, 1200mm and 1500mm diameter versions of Spectral Lightings new Stora-K creates a sumptuous low profile product with a lighting scheme which echoes the round table ‘suites’ design. As with all Spectral products, the rings are engineered to provide strong levels of illumination as well as being features of the space. This helped to give the light and bright ambience to the space that the client wanted. Designed by the architects, 2M2 Studio, the ‘Dixie’ is a premium hospitality suite providing an unparalleled premium dining experience at Goodison Park. The client gave high priority to the lighting of the space appropriately. The venue is marketed as “Nothing but the best is good enough’ is truly present through both the legend of our esteemed Everton Giant and everything this suite represents”. Spectrals lighting solution has gone some way to help achieving this.

Recent Spectral Projects

Kings College, London. Department of Music

Chivas Brothers HQ, Glasgow

Bristol University – Humanities Hub

DIXIE DEAN HOSPITALITY SUITE FC EVERTON

Panagram, 27 Goswell Road

Products Used

Stora-LK

Products Used

Stora-LK

Stora-LK

A suspended ring of light, available in four standard diameters with Direct only and Direct / Indirect options.

Spectral Projects

1-3 Pemberton Row, London

1-3 Pemberton Row, London

The offices at 1-3 Pemberton Row underwent a significant refurbishment to create a more modern, comfortable office,
Lord’s Cricket Ground

Lord’s Cricket Ground

Burrell Foley Fischer were the architects to the Contractor, Knight Harwood, for the refurbishment of the ...
Everton Football Club New Headquarters at The Royal Liver Building

Everton Football Club New Headquarters at The Royal Liver Building

Everton Football Club has relocated its headquarters from Goodison Park into new state-of-the- art facilities at ...
Puma HQ, London

Puma HQ, London

The interior design scheme of the new Puma HQ in London is the concept of ‘Light Speed’. This concept is conveyed ...
1

Pin It on Pinterest

Share This