Christ Church Downend

Bristol, UK

Christ Church Downend was constructed in 1836 and is a Grade II listed church. As part of the comprehensive refurbishment works that included removal of pews and a new limestone floor, a key factor in the transformation of the church was specifying new LED lighting throughout.

TSA consultants chose Spectral Lighting to design the lighting scheme after seeing previous completed heritage projects. Installed by Hart Design and Construction, the central pendant Spectral H80 chandelier fittings were delivered complete and raised from the ground into position pre wired and assembled. The architects, MEB Design Limited boldly chose to have the chandeliers finished in a modern textured silver finish which impacts less on the space, particularly for those in the upper balcony areas.

Winners of the Bristol DAC Awards 2019 for ‘Recognising Exceptional Church Project‘.

Architect:  MEB Design Ltd
M&E: Technical Support Associates M&E consulting engineers

Recent Spectral Projects

The Rowe Central House

HALO Bristol

The Bindery

Chivas Brothers Bottling Facility

John Robertson Architects

“We continue to be delighted with the way the building is working and never fails to evoke a ‘wow’ factor response. It is fast becoming a top choice venue for concerts in the Bristol area and a place where children and families love to come for all kinds of activities and events. Thank you again for all that you an the team did to make this possible.”

Jonathan Vickery

Vicar, Christ Church, Downend

Products Used

H80-Profil

H80-Profil

The H80 profile consists of two mirrored T-profile aluminium extrusions, which are joined by special connectors to form an extremely stable H construct.

Spectral Projects

ARM Cambridge

ARM Cambridge

Arm Holdings’ new headquarters building located on Peterhouse Technology Park, Cambridge is one of the most ...
Wolfson College Buttery

Wolfson College Buttery

Oxford UniversityWolfson College was founded in 1966 and is the largest and most international of the Oxford ...
Quartermile Q3 Fit Out Edinburgh

Quartermile Q3 Fit Out Edinburgh

Quartermile 3 is the latest development of cutting edge, city centre office space. This six storey Foster + ...
1-3 Pemberton Row

1-3 Pemberton Row

The offices at 1-3 Pemberton Row underwent a significant refurbishment to create a more modern, comfortable office,